Home

Dr. Tom M. Cavalier - Selected Publications


TMC's PSU Homepage | TMC's Selected Pubs | LP by Ignizio & Cavalier | TMC Woodworking


  • Cavalier, T.M., H.D. Sherali. Sequential Location-Allocation Problems on Chains and Trees with Probabilistic Link Demands. Mathematical Programming 32:249-277 (1985).

  • Cavalier, T.M., H.D. Sherali. Network Location Problems with Continuous Link Demands: p-medians on a Chain, 2-medians on a Tree. European Journal of Operational Research 23(2):246-255 (1986).

  • Cavalier, T.M., H.D. Sherali. Euclidean Distance Location-Allocation Problems with Uniform Demands over Convex Polygons. Transportation Science 20(2):107-116 (1986).

  • Cavalier, T.M., K.C. Schall. Implementing an Affine Scaling Algorithm for Linear Programming. Computers & Operations Research 14(5):341-347 (1987).

  • Ignizio, J.P., T.M. Cavalier, Classification Analysis via Goal Programming: And Implications for Supercomputer Implementation, Proceedings of the Second International Conference on Supercomputing. Volume 2: Industrial Supercomputer Applications and Computations, Santa Clara, CA, pp. 446-450 (1987).

  • Cavalier, T.M., M.J. Chandra, C.J. Liao, Scheduling of Molding Machines in a Foundry, Proceedings for the 24th Annual Meeting of the SE TIMS, Myrtle Beach, SC, pp. 158-160 (1988)

  • Cavalier, T.M., J.P. Ignizio, A.L. Soyster. Discriminant Analysis via Mathematical Programming: On Certain Problems and Their Causes. Computers & Operations Research 16(4):353-362 (1989).

  • Cavalier, T.M., M.J. Chandra, J.J. Liu. Scheduling of a Robotic Welding Cell, Productivity Management Frontiers - II, Proceedings of the Second International Conference on Productivity Research, Miami, FL, pp. 183-190 (1989)

  • Younis, N.A., T.M. Cavalier. On Locating Part Bins in a Constrained Layout Area for an Automated Assembly Process. Computers and Industrial Engineering 18(2):111-118 (1990).

  • Cavalier, T.M., P.M. Pardalos, A.L. Soyster. Modeling and Integer Programming Techniques Applied to Propositional Calculus. Computers & Operations Research Special Issue on "Expert Systems and Operations Research" 17(6):561-570 (1990).

  • Cavalier, T.M., B.J. Melloy. An Iterative Linear Programming Solution to the Euclidean Regression Model. Computers & Operations Research 18(8):655-661 (1991).

  • Irani, S.A., P.H. Cohen, T.M. Cavalier, Design of Cellular Manufacturing Systems, Proceedings of the 1991 ASME Winter Annual Meeting: Symposium on Design, Analysis, and Control of Manufacturing Cells, ASME, New York, pp. 47-70 (1991).

  • Irani, S.A., T.M. Cavalier, P.H. Cohen. Virtual Manufacturing Cells: Exploiting Layout Design and Intercell Flows for the Machine Sharing Problem. International Journal of Production Research 31(4):791-810 (1993).

  • Butt, S.E., T.M. Cavalier. A Heuristic for the Multiple Tour Maximum Collection Problem. Computers and Operations Research 21(1):101-111 (1994).

  • Grinde, R.B., T.M. Cavalier. A New Algorithm for the Minimal-Area Convex Enclosure Problem. European Journal of Operational Research Special Issue on "Cutting and Packing" 84(3):522-538 (1995).

  • Butt, S.E., T.M. Cavalier. An Efficient Algorithm for Facility Location in the Presence of Forbidden Regions. European Journal of Operational Research 90(1):56-70 (1996).

  • Grinde, R.B., T.M. Cavalier. Containment of a Single Polygon via Mathematical Programming. European Journal of Operational Research 92(2):368-386 (1996).

  • Grinde, R.B., T.M. Cavalier. A New Algorithm for the Two-Polygon Containment Problem. Computers and Operations Research 24(3):231-251 (1997).

  • Fraticelli, B.P., E.A. Lehtihet, T.M. Cavalier. Sequential Tolerance Control in Discrete Parts Manufacturing. International Journal of Production Research 35(5):1305-1319 (1997).

  • Butt, S.E., T.M. Cavalier. Facility Location in the Presence of Congested Regions with the Rectilinear Distance Metric. Socio-Economic Planning Sciences 31(2):103-113 (1997).

  • Wheeler, D.L., T.M. Cavalier, E.A. Lehtihet, An Implicit Enumeration Approach to Tolerance Allocation in Sequential Tolerance Control, IIE Transactions 31(1):75-84 (1999).

  • Fraticelli, B.P., E.A. Lethihet, T.M. Cavalier, Tool-Wear Effect Compensation under Sequential Tolerance Control, International Journal of Production Research 37(3):639-651 (1999).

  • Wheeler, D.L., T.M. Cavalier, E.A. Lehtihet, An Implicit Enumeration Approach to Probabilistic Tolerance Allocation under Conventional Tolerance Control, International Journal of Production Research 37(16):3773-3789 (1999).

  • Cavalier, T.M., E.A. Lehtihet, A Comparative Evaluation of Sequential Set Point Adjustment Procedures for Tolerance Control, International Journal of Production Research 38(8):1769-1777 (2000).

  • Ranade, S., E.A. Lehtihet, T.M. Cavalier, Comparative Evaluation of Composite Position Tolerance Specifications for Patterns of Holes, Proceedings of the 33rd International MATADOR Conference, University of Manchester, England, pp. 533-538 (2000).

  • Ranade, S.V., E.A. Lehtihet, T.M. Cavalier, On the Producibility of Composite Tolerance Specifications for Patterns of Holes, International Journal of Production Research 39(7):1305-1321 (2001).

  • McGarvey, R.G., E.A. Lehtihet, E. del Castillo, T.M. Cavalier, On the Frequency and Location of Set Point Adjustments in Sequential Tolerance Control, International Journal of Production Research 39(12):2659-2674 (2001).

  • Min, Xi, E.A. Lehtihet, T.M. Cavalier, A Mathematical Optimization Approach to the Tolerance Transfer Problem, Journal of Computing and Information Science in Engineering 1(2), (2001).

  • Scott, K.M., T.M. Cavalier, E.A. Lehtihet, A Probabilistic Method for Sequential Tolerance Control, International Journal of Production Research 39(17):4033-4048 (2001).

  • Min, Xi, E.A. Lehtihet, T.M. Cavalier, A Mathematical Optimization Approach to a Subset of Tolerance Transfer Problems, Transactions of the ASME: Journal of Computing and Information Science in Engineering 1(2):180-185 (2001).

  • McGarvey, R.G., E. del Castillo, T.M. Cavalier, E.A. Lehtihet, Four Parameter Beta Estimation – A Manufacturing Engineering Motivation, Proceedings of the 6th Annual International Conference on Industrial Engineering – Theory, Applications, and Practice, San Francisco, CA (2001).

  • Pandya, G.G., E.A. Lehtihet, T.M. Cavalier, Tolerance Design of Datum Systems, International Journal of Production Research 40(4):783-807 (2002).

  • Cavalier, T.M., E.A. Lehtihet, E. del Castillo, R.G. McGarvey, An Adaptive Sphere-Fitting Method for Sequential Tolerance Control, International Journal of Production Research 40(12):2757-2768 (2002).

  • McGarvey, R.G., E. del Castillo, T.M. Cavalier, E.A. Lehtihet, Four-Parameter Beta Distribution Estimation and Skewness Test, Quality and Reliability Engineering International Journal 18:395-402 (2002).

  • McGarvey, R.G., T.M. Cavalier, A Global Optimal Approach to Facility Location in the Presence of Forbidden Regions, Computers & Industrial Engineering 45(1):1-15 (2003).

  • Min, Xi, E.A. Lehtihet, T.M. Cavalier, A Numerical Approximation Approach to the Producibility of Composite Position Tolerance Specifications for Patterns of Holes, International Journal of Production Research 42(2):243-266 (2004).

  • McGarvey, R.G., T.M. Cavalier, E. del Castillo, E.A. Lehtihet, A Unified Framework for Probabilistic Sequential Tolerance Control, International Journal of Production Research 42(7):1443-1453 (2004).

  • McGarvey, R.G., T.M. Cavalier, Constrained Location of Competitive Facilities in the Plane, Computers & Operations Research 32(2):359-378(2005).

  • Cavalier, T.M., W.A. Conner, E. del Castillo, S.I. Brown, A Heuristic Algorithm for Minimax Sensor Location in the Plane, European Journal of Operational Research 182:42-55 (2007).

  • Tong, K., E. del Castillo, T.M. Cavalier, E.A. Lehtihet, S. Joshi, D-Optimal Design of Artifacts Used in Machine Software Error Compensation, International Journal of Production Research, pp. 1-8, iFirst (2007).

  • Wu, Gen-Han, T.M. Cavalier, Fleet Planning in the Car Rental Business, Proceedings of the Asia Pacific Industrial Engineering and Management Society, Kitakyushu, Japan, pp. 149-160, December 2009.

  • McGarvey, R.G., T.M. Cavalier, Determining the Location and Capacity of Competitive Facilities, International Journal of Mathematics in Operational Research 2(6):694-723 (2010).

  • Wilck, J.H., T.M. Cavalier, A Construction Heuristic for the Split Delivery Vehicle Routing Problem, American Journal of Operations Research, 2(2):153-162 (2012).

  • Wilck, J.H., T.M. Cavalier, A Genetic Algorithm for the Split Delivery Vehicle Routing Problem, American Journal of Operations Research, 2(2):207-216 (2012).

  • Wilck, J.H., T.M. Cavalier, A Column Generation Procedure for the Split Delivery Vehicle Routing Problem Using a Route-Based Formulation, International Journal of Operations Research and Information Systems 5(4):44-63 (2014).


TMC's PSU Homepage | TMC's Selected Pubs | LP by Ignizio & Cavalier | TMC Woodworking




Website developed by Oxygenesis Design.